Our offshore experience
From wind farms to offshore platforms and subsea connections, our projects span the Middle East, Europe and Asia.
Latest project

Fengmiao 1 offshore wind farm
TaiwanPeak WindEPCI CDWE
- Jacket foundations
- 33
- Offshore substation
- 1
- Year
- 2026
Pile grouting for 33 jacket foundations and one offshore substation.
Major projects
A selection of ULO’s major projects. Open a row for the full scope, the figures and, where ULO recorded one, how long it took.
34 projects
Offshore wind
Grouting for wind turbine foundations and offshore substations.
14Fengmiao 1 offshore wind farmTaiwan · Peak Wind · EPCI CDWE33 jackets
- Scope
- Pile grouting for 33 jacket foundations and one offshore substation.
- Delivered
- 33jacket foundations1offshore substation
- Timeline
- 2026
Hai Long offshore wind farmTaiwan · Northland Power · Mitsui · Gentari · EPCI CDWE73 foundations
- Scope
- Grouted connections for 73 jacket-foundation turbines in the Taiwan Strait.
- Delivered
- 73turbine foundations1,022MWcapacity2offshore substations
- Timeline
- 2024–2025
Saint-Brieuc offshore wind farmFrance · Iberdrola (Ailes Marines) · EPCI Van Oord62 jackets & piles
- Scope
- Grouting of 62 jacket foundations and piles in the Bay of Saint-Brieuc.
- Project details
- Two campaigns: 24 turbine jackets in 2022, then leg-to-pile grouting on 38 more in 2023.
- Delivered
- 62jacket foundations & piles496MWcapacity
- Timeline
- 2022–2023
Zhong Neng offshore wind farmTaiwan · CIP · China Steel (CSC) · EPCI CDWE31 turbines
- Scope
- Grouted connections across 31 turbine foundations.
- Delivered
- 31turbines300MWcapacity
- Timeline
- 2023
Moray West offshore wind farmUnited Kingdom · Ocean Winds (EDPR · ENGIE) · EPCI Boskalis2 substation platforms
- Scope
- Pile grouting for two offshore substation platforms.
- Timeline
- 2023
Changfang & Xidao (CFXD)Taiwan · CIP · COP · EPCI CDWE52 turbines
- Scope
- Grouted connections across 52 turbine foundations.
- Project details
- Pre-piled turbine jacket foundations with more than 150 legs and piles across multiple three-legged foundations, all grouted inside a single 104-day window.
- Delivered
- 52turbines600MWcapacity
- Timeline
- 104 days · Q2–Q3 2023
Baltic Eagle offshore wind farmGermany · Baltic Eagle GmbH · EPCI Heerema1 substation
- Scope
- Pile grouting for the offshore substation.
- Timeline
- 2022
Hollandse Kust West – Alpha substationNetherlands · TenneT · EPCI DEME1 substation
- Scope
- Pile grouting for the West Alpha offshore substation.
- Timeline
- 2022
Fécamp offshore wind farmFrance · Eolien Maritime France · EPCI DEME (SDI)1 substation
- Scope
- Leg-to-pile grouting and rock-socket grouting for the offshore substation.
- Timeline
- 2022
Hollandse Kust Noord – Beta substationNetherlands · TenneT · EPCI Scaldis · DEME1 substation
- Scope
- Pile grouting for the Beta offshore substation.
- Timeline
- 2021
Hollandse Kust Zuid – Beta substationNetherlands · TenneT · EPCI Heerema1 substation
- Scope
- Pile grouting for the Beta offshore substation.
- Timeline
- 2021
Moray East offshore wind farmUnited Kingdom · Moray Offshore Windfarm (East) Ltd · EPCI DEME100 turbine jackets
- Scope
- Pile grouting for 100 turbine jackets and three offshore substation jackets.
- Delivered
- 100turbine jackets3offshore substation jackets
- Timeline
- 2020
Hornsea 2 offshore wind farmUnited Kingdom · Ørsted · EPCI Heerema2 substation jackets
- Scope
- Pile grouting for the offshore substation and reactive compensation station jackets.
- Timeline
- 2020
Hollandse Kust Zuid – Alpha substationNetherlands · TenneT · EPCI Heerema1 substation
- Scope
- Pile grouting for the Alpha offshore substation.
- Timeline
- 2020
Fabric formworks
Engineered fabric formwork for scour, seal and free-span correction.
3Umm ShaifUnited Arab Emirates · ADNOC Offshore · EPCI NMDCSupply and installation of grout bags
- Scope
- Over 40 customized CS tunnel grout bags.
Grout bag supply – ADNOC & Saudi AramcoUnited Arab Emirates · ADNOC · Saudi AramcoSupply and installation of grout bags
- Scope
- Supply of over 5,000 grout bags for ADNOC and Saudi Aramco projects, in sizes customized to each design specification.
Pipeline rectification – DWP-215United Arab Emirates · Dubai PetroleumSupply and installation of grout bags
- Scope
- Free-span correction on subsea pipelines, using customized grout formulations with a double-shaft mixer, cavity pump and 40 MT vertical silos.
Structural grouting
Grouted connections for fixed offshore platform foundations.
7Hail & Ghasha – LTDP 2United Arab Emirates · ADNOC Offshore · EPCI NMDC5 jackets grouted
- Scope
- Structural grouting of five jacket foundations.
Al Shaheen – COMP 2Qatar · North Oil Company · EPCI Saipem4 jackets grouted
- Scope
- Structural grouting of four jacket foundations.
Marjan & Zuluf – LTA 124 & 139Saudi Arabia · Saudi Aramco · EPCI Saipem5 jackets grouted
- Scope
- Structural grouting of five jacket foundations.
Blythe & Vulcan satellitesUnited Kingdom · Independent Oil & Gas · EPCI Seaway72 jackets
- Scope
- Low-strength grouting of suction buckets for the Southwark and Blythe jackets.
- Timeline
- 2021
Tyra redevelopment – phase 1Denmark · Total E&P Danmark · EPCI Heerema2 platforms
- Scope
- Pile grouting for the TEG and TEH platforms.
- Timeline
- 2020
Tyra redevelopment – phase 2Denmark · Total E&P Danmark · EPCI Heerema5 platforms
- Scope
- Pile grouting for the TEB, TEC, TEF, TWB and TWC platforms.
- Timeline
- 2020
Ghallaf, Marjan & DBN PonticelliQatar10 jackets grouted
- Scope
- Structural pile grouting for 10 jackets across the Ghallaf, Marjan and DBN Ponticelli projects in Qatar and Saudi Arabia.
Precast concrete products
Support and protection for pipelines, cables and subsea connections.
10Project Lightning (HVDC)United Arab Emirates · ADNOC Offshore · EPCI Jan De NulSupply of concrete mattresses
- Scope
- Mattress protection for a subsea HVDC interconnector route.
- Project details
- The mattresses protect HVDC cables running from Al Ghallan and Das islands to onshore converter stations in Abu Dhabi.
- Timeline
- 12 months
Hail & Ghasha – HURLKUnited Arab Emirates · ADNOC Offshore · EPCI NMDCSupply of concrete mattresses
- Scope
- Concrete mattress supply and placement.
Lower Zakum – LTDP 1United Arab Emirates · ADNOC Offshore · EPCI McDermottSupply of concrete mattresses
- Scope
- Cable and pipeline protection across the Lower Zakum field.
Abu Safah & Safaniya – LTA 85/92/93/96Saudi Arabia · Saudi Aramco · EPCI SaipemSupply of concrete mattresses, sleepers and anchor blocks
- Scope
- Mattresses, precast sleepers and anchor blocks across two fields.
- Project details
- The sleepers and anchor blocks support subsea crossings and correct the spans of rigid pipelines; the flexible mattresses adapt to uneven seabed, forming three-dimensional shapes for crossings, mechanical protection and the stabilization of flexible pipelines and submarine cables.
Marjan & Zuluf – LTA 132 & 139Saudi Arabia · Saudi Aramco · EPCI SaipemSupply of concrete sleepers
- Scope
- Precast concrete sleeper supply and placement.
Marjan – LTA 127Saudi Arabia · Saudi Aramco · EPCI SaipemSupply of concrete sleepers
- Scope
- Precast concrete sleeper supply and placement at Marjan.
CRPO 86Saudi Arabia · Saudi Aramco · EPCI NPCCSupply of concrete sleepers and protection slabs
- Scope
- Sleepers and protection slabs.
Hail & GhashaUnited Arab Emirates · ADNOC Offshore · EPCI SaipemSupply of concrete mattresses and sleepers
- Scope
- Sleepers and UNI-mattresses for pipeline support and protection.
Lower Zakum – ecological mattressesUnited Arab Emirates · ADNOC Offshore · EPCI AD Ports GroupSupply of concrete mattresses
- Scope
- Mattress protection including two ecological concrete mattresses, designed to encourage marine growth.
Zuluf AH West & East – CRPO 82 & 83Saudi Arabia · Saudi AramcoSupply of concrete sleepers
- Scope
- Supply of 368 offshore concrete sleepers for the Zuluf AH West and East oil facilities.
- Timeline
- four months